// Affordable Housing

Selis Manor

Association for the Blind HDFC // 2017

Photo credit: Magnusson Architecture and Planning

Olive Branch Consulting Ltd - Selis Manor

Overview

The Selis Manor project was a full gut renovation of an existing building, along with facade restoration and select exterior improvements – e.g. rooftop terrace for tenants, renovated courtyard space – and added space on the ground level for tenant services. Existing tenant amenities like the bowling alley and fitness spaces in the cellar were renovated as well. 

The biggest challenge was that the building was occupied throughout the course of renovation, and the tenants were largely vision-impaired. The renovation required asbestos abatement as well, which meant phasing became more complicated with the decon units and required minimum means of egress, while having to leave a stairwell for the tenants, and expansive air monitoring. Tenants were moved out 2 floors at a time – either to apartments outside of the building in another neighborhood, or into open units elsewhere in the building whenever possible. Work that impacted still-occupied units required careful scheduling and coordination with trades.

Olive Branch Consulting Ltd - Selis Manor

Before

Olive Branch Consulting Ltd - Selis Manor

After

Details

Location

New York, NY

Client

Association for the Blind HDFC

Architect

Magnusson Architecture & Planning

General Contractor

Procida Construction Corp.

Services

Owner’s Representative

Original Budget

$37.5 Million

Construction Cost

$37.5 Million


Joe and the team at Olive Branch are great to work with! Their experience and technical knowledge are a real asset for our projects, helping to ensure quality products through strong coordination and commitment to success.

Fernando Villa AIA LEED AP BD+C // Principal, Magnusson Architecture and Planning PC